Chapter 494: 227: The Inflection Point Approaches
Loading Edge voices…
Dai Qiguo, the chairman of Jiangxin Shipbuilding, and his delegation quickly secured an order from Hailufeng Company’s logistics division for 30 inland river transport vessels and 10 ocean-going bulk carriers.
These vessels were all electric transport ships.
The inland river transport vessel order included ten 1,000-ton, ten 2,000-ton, and ten 5,000-ton bulk carriers.
The ten ocean-going bulk carriers consisted of five 10,000-ton and five 20,000-ton vessels.
In addition, Jiangxin Shipbuilding Company was also commissioned to develop and produce two types of battery supply ships.
One type was for use on inland rivers, capable of carrying batteries and equipped with hoisting machinery for rapidly swapping battery containers.
The other was for use in coastal waters, with a design largely similar to the inland river model.
The reason for designing these battery supply ships was simple. There were concerns that electric transport vessels might run low on power mid-journey. It was also possible that nearby ports wouldn’t be able to accommodate ships of their size, forcing them to be resupplied at sea or en route.
This was similar to a fuel supply ship.
For the rather sluggish shipbuilding industry, such a large order would keep Jiangxin Shipyard busy for at least half a year.
After all, traditional transport ships not only had low profit margins but also faced intense internal competition. Among the various types of vessels in the shipbuilding industry, only the construction of natural gas carriers was relatively profitable.
Just after Jiang Miao saw off Dai Qiguo and his delegation...
Liu Shanhe, the General Manager of Southern Power Group, paid another visit. And he didn’t come alone. With him were representatives from National Power Grid, CITIC International, Cosco Shipping, National Energy Investment Corporation, Three Gorges Group, China General Nuclear Power Corporation, and Huadian Heavy Industry.
These companies fell into three categories: power grids, port services, and power generation.
Evidently, these state-owned enterprises were much better informed than private companies.
They had actually received news about Hailufeng Company’s development of the Sponge Battery over a month ago. For the past month, they had either been studying the Sponge Battery’s performance or discussing how to utilize it.
The power grid companies’ idea was to use the Sponge Battery to regulate fluctuations in the power supply.
The port service companies were inclined to use the Sponge Battery to develop battery-swapping services.
The new energy power generation companies were focused on using the Sponge Battery to manage wasted electricity, thereby shortening their return-on-investment period.
The result of their discussions was that they also discovered Hailufeng Company was planning its own network of inland electric transport vessels and battery-swapping terminals. They figured it would be best for all four parties to cooperate.
After listening to the descriptions from Liu Shanhe and the others...
Jiang Miao had no objections. "I understand your ideas."
The three parties’ idea was very simple: to renovate ports and build battery-swapping stations. These swapping stations could perform peak-shaving and valley-filling, as well as sell electricity.
If this could be achieved, the entire new energy sector would be completely revitalized.
Jiang Miao explained Hailufeng Company’s plan. "Our company intends to operate using a battery leasing model."
"Battery leasing?" General Manager Zhao from CITIC International had never heard of such a concept before and asked curiously, "How does General Manager Jiang intend to lease the batteries?"
Jiang Miao didn’t beat around the bush and got straight to the point. "It’s very simple. For the full lifespan of one cubic meter of battery cells, the rent is 10,000 yuan, plus a 10,000 yuan security deposit."
A vice president from National Power Grid did some quick calculations. "Your company’s battery has a lifespan of 600 cycles... A single discharge is 400 kWh, so the total lifespan is 240,000 kWh. With a rental cost of 10,000 yuan, that comes out to about 0.0416 yuan per kWh. So, the battery cost per kWh is about four fen?"
Liu Shanhe shook his head. "You can’t calculate it like that. We can adjust the battery cell configuration to keep the discharge power of a single cell below 60 kilowatts. That way, the battery’s cycle count can reach around 800 cycles. The total lifespan would be 320,000 kWh, bringing the battery cost per kWh down to about three fen."
"That makes sense."
"Adding in infrastructure, power loss, maintenance, and labor, the cost per kWh will increase by about six or seven fen."
This cost was within their acceptable range.
After all, the current factory price for lithium iron phosphate battery cells was around 33,000 yuan per ton.
A ton of lithium iron phosphate batteries, in good factory condition, has a storage capacity of 160 kWh and can be cycled 2,000 to 3,000 times. Assuming 2,500 non-degrading cycles, the total lifetime storage is 400,000 kWh. Factoring in about 10% power loss, the total lifetime discharge is 360,000 kWh.
The average battery cost per kWh is about nine fen.
In reality, this battery cost would certainly be closer to twelve fen per kWh, or even higher.
Including other costs, the total cost for a complete energy storage system reached about fifteen fen per kWh.
It’s important to understand that the current price the power grid pays new energy generation companies is only thirty to forty-something fen per kWh. An energy storage system alone would consume one-third, or even close to half, of that revenue, leaving even less to cover other costs.
Take large-scale onshore wind power as an example.
Currently, due to intense competition, the comprehensive investment cost for onshore wind power projects has been driven down to around 1,200 to 1,500 yuan per kilowatt of installed capacity.
At this cost, if electricity is sold at 0.45 yuan per kWh, it would take about 2,666 to 3,330 hours of full-power generation to recoup the investment cost.
However, if a matching energy storage system is built, and daily operational and maintenance costs are included, the cost per kWh would reach about 0.26 yuan.
If they happen to get a low on-grid tariff, the revenue per kWh would only be about ten fen, which is what’s left to cover the investment costs of the turbines and construction. This would require 12,000 to 15,000 hours of full-power generation to break even.
Sounds good, right?
After all, the construction areas for wind power projects can generate power for an average of about 3,000 hours per year, which means a payback period of only about 4 to 5 years.
However, reality is cruel.
Because the amount of power generated does not equal the amount of power fed into the grid.
Many times, wind farms generate electricity when the grid doesn’t need that much power. Since the wind power companies themselves don’t have large-scale energy storage systems, they can only let that electricity go to waste.
Under ideal conditions, an onshore wind project can break even in about 10 years.
Offshore wind projects are even more daunting. The current comprehensive cost per kilowatt of installed capacity for offshore wind projects is 3,000 yuan. Ideally, it would take 20 years to break even.
Offshore wind projects also have a fatal flaw, especially those on the Southeast Coast. If they encounter a typhoon, an unlucky project might see its entire wind turbine destroyed, further increasing the overall cost.
Therefore, after government subsidies were removed in recent years, wind power projects have become half-dead.
Now, using the Sponge Battery could reduce the comprehensive battery cost by about 50% and also improve the grid’s capacity for power absorption, thus allowing the generated electricity to be fully utilized.
The general managers of these new energy companies were already constantly calculating the costs.
Finally, they reached a conclusion: by using the Sponge Battery, the payback period for onshore wind projects could be compressed to about 5 to 6 years, and for offshore wind projects, it could be compressed to about 10 to 12 years.
If they were lucky and experienced several consecutive years of stable, high-efficiency power generation, these wind power projects could even see their payback periods shortened further.
Compared to the previous payback periods that could easily be ten or even twenty-plus years, they already felt this was excellent.
Although they knew Hailufeng Company was definitely making a fortune from the Sponge Battery, they understood it was because of superior technology. Since they were technologically inferior, they could only obediently pay up.
Soon, these general managers from the state-owned enterprises borrowed an office at Hailufeng Company to hold a meeting and discuss further cooperation.
The result of their discussion was the establishment of two operating companies: Southern Energy Storage and Northern Energy Storage.
Each of the new energy companies took out their emergency funds. They planned to quickly recoup some of their losses by investing in Southern Energy Storage and Northern Energy Storage.
After finishing their discussion about the new joint ventures, Southern Energy Storage and Northern Energy Storage placed a lease order with Hailufeng Company for as much as 200,000 cubic meters of Sponge Battery cells.
The plan was to first build a batch of battery-swapping stations along the ports in the coastal areas. Once these stations were built, even if there were no electric ships needing to swap batteries, they could still earn a significant amount of money each year by regulating the power grid.
Discussing these matters, they haggled back and forth for over a week before planning a press conference in Shanmei District.
At this point, Hailufeng Company’s Sponge Battery could no longer be kept under wraps.
It wasn’t just other state-owned enterprises that received the news.
Domestic new energy companies also got word.
Among them, concept stocks related to wind power, photovoltaics, electric motors, and shipbuilding soared, hitting their daily trading limit almost every day.
Meanwhile, lithium battery concept stocks plummeted.
Amidst this world of ice and fire, the press conference was officially held at the Pingqing Lake Government Center in Shanmei District.
Jiang Miao did not attend. Instead, Lin Shuya and the manager of the battery division, Liu Haitao, represented Hailufeng Company.
At the venue, besides domestic and international news media, there were many professionals from new energy companies, including R&D personnel, as well as company general managers and executives.
Some were ecstatic, some wore worried frowns, and others were whispering amongst themselves. The entire venue was as noisy as a marketplace.
Lu Zhenwei of Jingneng International was also there. He had already settled a cooperation deal with Jiang Miao a few days ago. The two parties would form a joint venture to produce batteries. In this joint venture, Hailufeng Company would hold a 49% stake, and Jingneng International would hold 51%. Jingneng would be responsible for management, while Hailufeng Company would only provide financial oversight. The company would be named Jingneng Battery Company.
There was another condition: for every cubic meter of Sponge Battery cells produced, a patent fee of 3,000 yuan had to be paid to Hailufeng Company.
Although Hailufeng Company was taking 80% of the profits, these were acceptable terms for Jingneng International.
In addition, National Energy Investment Corporation also cooperated with Hailufeng Company under the same conditions, establishing another joint battery venture—Guodian Battery Company.
The battery companies that had just arrived had already found out about Hailufeng Company’s partnerships with Jingneng and National Energy Investment Corporation. This came as a huge shock, and they were also extremely frustrated and anxious.
Although Hailufeng Company had not yet entered the core markets of automotive and mobile phone batteries, the battery-swapping project they had heard about was enough to corner the market of every seaport in the country.
But being anxious was useless. Right now, they could only pray that Hailufeng Company would give them some breathing room. Otherwise, the domestic battery industry was doomed.